Risk
Quantified potential for negative outcome
Mechanism
A structured representation of potential negative outcomes. It combines: 1. Probability (likelihood of occurrence), 2. Severity (impact Metric if it occurs), 3. Mitigation (actions to reduce probability or severity), 4. Trigger (conditions that indicate the risk is materializing). Risks are attached to steps, aggregated at the manifest level, and may violate constraints if they materialize.
Invariants
- Quantification: probability and severity are estimated, not just named.
- Every risk names its disposition — a mitigation, or an explicit acceptance.
- Monitoring: triggers are observable during execution.
Failure modes
- Risk Blindness: Failing to identify a material risk.
- Risk Theater: Documenting risks without meaningful mitigation.
- Probability Miscalibration: Systematically under/over-estimating likelihood.
- Cascade Blindness: Missing that one risk triggers others.
Where this came from
—
Builds on
- Probability references
- Metric references
Used by
- Brakegrow references
- MechanisticDesignProposal references
- Plan references
- TaskLifecycle references
Related
Identity
- Ref:
Risk#e7f6 - Hash: sema:Risk#mh:SHA-256:e7f601ff0058d606ea87ab5f196f78f469a3133f8324617ff8a25d8072422e91
- Library: bootstrap 0.11.0, root a6a3d1ff0f98
- License: Not stated; check the repository