Estimate

Predictive resource costing

Mind · Reasoning · bootstrap 0.11.0

Mechanism

The predictive Think process of calculating the probable Value cost of a Task before execution. Two modes: HeuristicSnap for fast rough estimates, Simulation for accurate expensive ones. Outputs a Bid carrying an interval, its coverage, and the reference class it was drawn from. Consumes Budget.

Invariants

Parameters

Signature

Failure modes

Where this came from

—

Builds on

Used by

Identity