Estimate
Predictive resource costing
Mechanism
The predictive Think process of calculating the probable Value cost of a Task before execution. Two modes: HeuristicSnap for fast rough estimates, Simulation for accurate expensive ones. Outputs a Bid carrying an interval, its coverage, and the reference class it was drawn from. Consumes Budget.
Invariants
- The interval states the coverage it claims.
- The estimate names its reference class, or records that it had none.
- The estimator is given its allowance from Budget before starting, and returns on reaching it.
Parameters
- estimation_allowance: type=Ratio, range=(0.0, 1.0], description=Share of the task's budget the estimator may spend.
- target_coverage: type=Ratio, range=(0.0, 1.0), description=Coverage the published interval claims, e.g. 0.8 or 0.95.
Signature
- Think(Value)
Failure modes
- Overconfidence: intervals narrower than the evidence supports.
- Anchoring: estimates biased by irrelevant prior information.
- Planning Fallacy: systematic underestimation of time and cost.
- Allowance exhausted: returns a wide interval a caller may read as a point estimate.
Where this came from
—
Builds on
- HeuristicSnap references
- Value references
- Simulation references
- Budget references
- Task accepts
- Bid yields
- Think composes_with
Used by
- Fermi composes_with
- MarginalValueRule references
Identity
- Ref:
Estimate#3bac - Hash: sema:Estimate#mh:SHA-256:3bacc0606623a0603b271a835b54157c2e86389c4282af86d88cd1ddd9ecf917
- Library: bootstrap 0.11.0, root a6a3d1ff0f98
- License: Not stated; check the repository