ComputeBudget
Economic governor for cognitive spend
Mechanism
The cognitive governor that prevents analysis paralysis. It acts as a dual-ledger Gate, weighing the Value of a Task against the Budget to ensure return on investment (ROI). It enforces stopping rules when the cost of thinking exceeds the value of the solution.
Invariants
- Hard ceiling: total execution cost cannot exceed `max_budget`.
Parameters
- max_budget: type=PositiveInteger, range=unspecified, description=The ceiling, in `unit`. Deliberately uncapped.
- roi_threshold: type=Float, range=[0.1, 2.0], description=Expected value required per unit spent before work proceeds. Scales how demanding the gate is; it does not license spending past the ceiling.
- estimation_share: type=Ratio, range=(0.0, 0.5], description=Share of the budget estimation may consume before it must return.
- unit: type=Enum, range={Tokens, USD, Ms}, description=Cost unit
Preconditions
- Current resource balance available
- Task value estimated
Postconditions
- Budget constraints injected into Task context
- Execution strategy Selected (Direct vs Recursive)
Failure modes
- Analysis Paralysis: Spending more on estimation than the task is worth.
- Penny Wise: Rejecting necessary deep thinking for high-stakes/high-complexity problems.
- Cost estimation is itself costly (meta-cost problem).
- Uncertainty about uncertainty makes expected_gain hard to calculate.
- Risk of penny-wise pound-foolish: refusing decomposition on hard problems because estimate was wrong.
Where this came from
—
Builds on
Used by
- Bid references
- EpistemicROI references
- OptimisticSolver composes_with
- PolymorphicSolver composes_with
- Reason references
- StrategicReading references
Related
Identity
- Ref:
ComputeBudget#4091 - Hash: sema:ComputeBudget#mh:SHA-256:4091ac7c6677342920dc53808d02830e35c5849f2af1bb9ba7749c576d37478e
- Library: bootstrap 0.11.0, root a6a3d1ff0f98
- License: Not stated; check the repository